AS9102 glossary
AS9102, FAI, FAIR, and GD&T glossary
Short, review-focused definitions for the terms aerospace suppliers use while preparing AS9102 First Article Inspection Reports.
Updated July 3, 2026
Batch 1 publish scope
This first glossary batch publishes 25 entries covering AS9102 Forms 1-3, FAI scope, ballooned drawing traceability, Form 3 characteristic rows, product evidence, and common GD&T review terms. Future batches should continue in smaller dated releases rather than publishing the full 100-150 term target in one day.
A
B
C
D
F
G
I
M
N
P
R
S
Related AS9102 guides
Changelog
July 3, 2026: Published glossary batch 1 with 25 AS9102, FAI, FAIR, Form 1/2/3, product-evidence, and GD&T entries plus DefinedTerm schema, FAQ schema on entry pages, internal links, sitemap entries, and crawler summary entries.
Review AS9102 fields against the print
Articul pre-fills Forms 1-3 from the print and routes anything uncertain to you, including drawing notes and title-block fields, while preserving source traceability for review.
Upload a drawingHosted upload is for non-controlled drawings only. Do not upload export-controlled (ITAR/EAR) technical data to hosted; ask about self-host.