A Articul

AS9102 Form 2 template

AS9102 Form 2 template for product accountability

Form 2 proves that the material, special processes, and functional tests used for the first article match the engineering definition and have traceable evidence.

Updated July 2, 2026 · AS9102 Rev C · Ungated download

What is included

The workbook includes a fillable Form 2 row template for material, process, and functional test accountability. Use one row for each material, process, or test that applies; the field guide below explains each column.

Field Name Requirement Example value Reviewer note
1 Part Number Required BRK-1042 Carried from Form 1.
2 Part Name Required Mounting Bracket Carried from Form 1.
3 Serial Number Conditional SN-0007 Required when serialized.
4 FAIR Identifier Required FA-2300 Carried from Form 1.
5 Material or Process Name Conditional Aluminum 6061-T6 One row per material, process, or test.
6 Specification Number Conditional AMS-QQ-A-250/11 The governing specification.
7 Code Optional N/A Customer or supplier code when required.
8 Supplier Conditional Acme Metals Source that supplied material or performed process.
9 Customer Approval Verification Conditional N/A Use yes/no/N/A consistently.
10 Certificate of Conformance Number Conditional CERT-44819 Traceable certificate or report number.
11 Functional Test Procedure Number Conditional N/A Required for functional testing.
12 Acceptance Report Number Conditional N/A Report proving functional acceptance.
13 Comments Optional Material cert attached. Use for clarifying evidence.

Evidence to attach

Each material or special-process row should trace to a certificate, approved supplier record, or acceptance report. Treat the spreadsheet as the index that points reviewers to the evidence.

Common Form 2 gaps

The most common gaps are missing suppliers, missing certificate numbers, and special processes listed only in drawing notes but not carried into Form 2.

Frequently asked questions

What goes on AS9102 Form 2?

Materials, special processes, and functional tests that are part of the engineering definition or required by the manufacturing plan.

Do I list every outside processor on Form 2?

List the supplier or processor needed to prove the material, special process, or test was performed by the approved source required for the FAIR.

Changelog

July 2, 2026: Published the AS9102 Rev C page, download assets, completed example image, FAQ schema, and sitemap entry.

Turn the template into a reviewed FAIR package

Articul pre-fills Forms 1-3 from the print and routes anything uncertain to you, including drawing notes and title-block fields, while tying ballooned characteristics to source regions before export.

Upload a drawing

Hosted upload is for non-controlled drawings only. Do not upload export-controlled (ITAR/EAR) technical data to hosted; ask about self-host.