AArticul

Prime FAIR requirements

Lockheed Martin FAIR requirements: Q2A and AS9102 prep

Use this as a public-source orientation only. Lockheed Martin purchase-order clauses and buyer direction control the actual requirement for a supplier FAIR.

Updated July 2, 2026

Lockheed Martin FAIR requirement preparation checklist for AS9102 suppliers
Lockheed Martin FAIR requirement preparation checklist for AS9102 suppliers

Q2A signals to plan around

Q2A topic Supplier prep action
Concurrent use with AS9102 Read Q2A together with AS9102 and the purchase-order language instead of treating AS9102 alone as complete.
Buyer authority Route interpretation questions through the buyer path named by the PO or clause.
Sub-tier flowdown Make sure processors and sub-tier suppliers receive the applicable FAI requirements.
Design characteristics Account for all technical-data-package characteristics that can affect fit, form, or function.
FAI planning Plan before the first production deliverable; do not let FAIR creation become a shipment-day paperwork exercise.

Review focus

For Lockheed Martin work, the risky gaps are not only blank Form 3 results. They are missing embedded design characteristics, unclear buyer-authorized interpretations, weak sub-tier evidence, and a package that cannot show how the first production run validated product-realization planning.

FAQ

Does Q2A replace AS9102?

No. Q2A is buyer-unique direction that must be read with AS9102 when it is flowed on Lockheed Martin Aeronautics work.

Can a supplier decide FAI by similarity on its own?

Do not assume that. Use the purchase-order clause and buyer direction for any similarity, exclusion, or interpretation decision.

Source notes

Source links are used for public orientation only. Purchase orders, customer portals, and controlled supplier-quality documents govern actual requirements.

Changelog

July 2, 2026: Published the Wave 3 AS9102 resource page with source notes, FAQ schema, visible freshness date, and sitemap entry.

Keep the FAIR review tied to the print

Articul pre-fills Forms 1-3 from the print and routes anything uncertain to you, including drawing notes and title-block fields, while preserving source traceability for review.

Upload a drawing

Hosted upload is for non-controlled drawings only. Do not upload export-controlled (ITAR/EAR) technical data to hosted; ask about self-host.