Collins Aerospace FAI requirements: AS9102 prep notes

Use this as a public-source orientation only. Collins purchase orders, site documents, and supplier-quality direction control the actual FAIR requirement.

Updated July 2, 2026

Collins Aerospace FAI requirement preparation checklist for AS9102 FAIRs
Collins Aerospace FAI requirement preparation checklist for AS9102 FAIRs

A-9000 signals to plan around

Topic Supplier prep action
AS9102 FAI Use the current AS9102 revision and the Collins document flowed for the site or business unit.
English/equivalent forms Confirm format and language expectations before submission.
Sub-tier flowdown Flow Collins and AS9102 FAI requirements to applicable sub-tier suppliers.
Approval before shipment Plan enough lead time for Collins review where approval is required before shipment.
Trigger events Watch first production lot, source/process/tooling/material changes, corrective action, NC program changes, events affecting the process, and two-year lapse language.

Submission readiness

The practical risk is timing: a technically complete FAIR can still block shipment if the customer-required approval path is not complete. Keep Form 1 approvals, Form 2 certificates, Form 3 results, CMM evidence, and sub-tier records in one review package.

FAQ

Does Collins require approval before shipment?

Some public Collins supplier-quality language says the supplier is not authorized to ship until Collins approves the FAIR or gives other authorization. Confirm the document and PO that apply to your part.

Does a two-year lapse trigger FAI?

Collins public A-9000 language includes a two-year lapse trigger or the period specified by purchase order. Use the flowed document for the controlling rule.

Source notes

Source links are used for public orientation only. Purchase orders, customer portals, and controlled supplier-quality documents govern actual requirements.

Changelog

July 2, 2026: Published the Wave 3 AS9102 resource page with source notes, FAQ schema, visible freshness date, and sitemap entry.

Keep the FAIR review tied to the print

Articul pre-fills Forms 1-3 from the print and routes anything uncertain to you, including drawing notes and title-block fields, while preserving source traceability for review.