Net-Inspect supplier guide
The supplier guide to Net-Inspect FAIRs
Net-Inspect is often the customer-facing place where a FAIR is submitted and reviewed. Suppliers still need a clean AS9102 package before they type or import anything into the portal.
Updated July 2, 2026 · AS9102 Rev C · Source-linked guide
Supplier workflow
- Confirm the customer mandate, purchase-order clauses, and whether Net-Inspect submission is required.
- Prepare Forms 1-3 from controlled drawing and production evidence before portal entry.
- Attach material certificates, process certificates, CMM reports, nonconformance dispositions, and source drawings.
- If importing measurements, export the current Net-Inspect template from the customer workflow and validate the column layout before relying on any upload.
- Run a pre-submit review for missing Form 3 results, incomplete Form 2 evidence, and unsigned Form 1 approvals.
- Submit through Net-Inspect or the customer portal only after the package is internally review-ready.
What Net-Inspect does
Net-Inspect describes FAI software for creating, reviewing, sending, receiving, approving, and tracking FAIRs across supplier/customer workflows. Public customer announcements also describe online buyoff, FAIR linking for assemblies, and attaching supporting files.
Pre-submit checks
| Check | Why it matters |
|---|---|
| Field 14 reason | Rev C expects a reason for full or partial FAI. |
| Form 2 certificate numbers | Missing material or process evidence creates review loops. |
| Form 3 blank results | A row without objective evidence is not ready for approval. |
| Assembly FAIR links | Higher-level FAIRs can depend on detail and sub-assembly traceability. |
| Portal format | Customer templates and import columns can differ from internal spreadsheets; use the current exported template as the source of truth. |
Related AS9102 resources
Source notes
Frequently asked questions
Is this page affiliated with Net-Inspect?
No. Net-Inspect is named descriptively because many suppliers are required by customers to submit FAIRs there.
Can Articul replace a customer-mandated Net-Inspect submission?
No. If the customer mandates Net-Inspect, submit there. Articul helps prepare and review the FAIR before that submission step; any Net-Inspect import template should be validated against the customer's current portal workflow.
Changelog
July 2, 2026: Published the Wave 2 AS9102 resource page with source notes, FAQ schema, visible freshness date, and sitemap entry.
Prepare the FAIR before the rework starts
Articul pre-fills Forms 1-3 from the print and routes anything uncertain to you, including drawing notes and title-block fields, while keeping the review tied to the source drawing.
Upload a drawingHosted upload is for non-controlled drawings only. Do not upload export-controlled (ITAR/EAR) technical data to hosted; ask about self-host.